The Vale Company

Driveway · build record

Block paved driveway with an EV charger and linear drainage

Charger position cut around cleanly, water caught in a channel at the road edge.

These photographs document the two details that decide whether a modern block drive works day to day: how the paving meets the EV charger and its cable route, and where the water goes.

The blocks are cut around the charger base rather than butted up loose, and a linear channel runs across the entrance so surface water is caught before it reaches the pavement instead of being pushed onto it.

The photographs

5 photographs. Tap any one to open the viewer, then swipe or use the arrows.

Other records

Call [PHONE]