The Vale Company

The cheapest driveway in Aylesbury — and what cheap actually costs you

The straight answer

Gravel is the cheapest driveway you can build properly: roughly £45–£85 per square metre. Tarmac is next at £75–£110. Block paving and resin bound sit above both, at £90–£140.

Gravel — cheapest

£45–£85 / m²

Fully permeable. Cheapest per square metre by a clear margin.

Tarmac — next

£75–£110 / m²

Cheapest way to cover a large area with a solid surface.

Resin bound

£90–£140 / m²

Best value over a sound existing base.

Block paving

£95–£140 / m²

Most expensive of the four, and the only one that lifts and relays.

Those are installed prices including the ground work, not material costs. They are ranges because access, what has to come out and where the water goes move the figure more than the surface does.

What a cheap driveway looks like when it's done properly

A gravel drive over a geotextile membrane and 150mm of MOT Type 1, compacted in layers, with the gravel held in a grid and the edges haunched in concrete, is a perfectly good driveway. It carries cars, it drains through, it doesn't need planning permission, and if you dig it up for a cable you can put it back invisibly.

It is not a compromise and we're not going to describe it as one. What gives gravel a bad name is stone tipped straight onto soil with nothing restraining the edge — that isn't a cheap driveway, it's an absence of one.

The same applies to tarmac. A tarmac drive on a correct base outlasts a block paved drive on a bad one, comfortably.

How we build a gravel drive →

What gets cut when a quote is too cheap

A price well below the market on the same surface has to come from somewhere. It comes from the parts of the job that are invisible on handover day. This is the same list as on how we build, because it doesn't change.

  1. Cut 1

    No membrane

    A few pounds a square metre saved. Without it the sub-base slowly migrates into the subsoil and the subsoil pumps up into the sub-base. The drive loses its structure from below and there is no way to fix it except taking it all up.

  2. Cut 2

    75mm of sub-base instead of 150mm

    Half the stone, half the lorry movements, half the compaction time. It holds up under foot traffic and under a car for a year or two, then it starts to dish where the wheels sit.

  3. Cut 3

    Edges bedded on sand instead of haunched in concrete

    The edge is what holds the whole field of blocks in compression. On sand it creeps outwards, the joints open, and the drive spreads from the perimeter inwards.

  4. Cut 4

    Building sand instead of sharp sand for the laying course

    Building sand is soft and holds water. Under load it consolidates unevenly, so the blocks rock and the surface goes wavy.

  5. Cut 5

    One thick layer of Type 1 instead of compacted 75mm layers

    A whacker plate only compacts the top 75mm or so. Tip 150mm in one go and the bottom half is loose stone under a hard crust. It looks identical on handover day.

Every one of those is invisible the day the job finishes. That is precisely why they are the things that get cut.

The arithmetic

A relay — taking a failed drive up and rebuilding it — costs £60–£95 per square metre. On a 50m² drive:

Cost of a cheap driveway relaid after four years, compared with building it properly once
50m² drivewayCheap now, relay laterBuilt properly once
First build£60/m² — £3,000£95–£140/m² — £4,750–£7,000
Relay after four years£75/m² — £3,750
Total£6,750, disruptive twice£4,750–£7,000, once

That isn't a scare tactic and it isn't a universal law — it's arithmetic that only applies if the cheap drive actually fails, and plenty don't. Here's the honest caveat: if you're selling the house in two years, the cheap option may genuinely be the right call for you. You will not be there for the relay, and the buyer will see a drive that looks fine. We'd rather say that than pretend otherwise.

Three ways to spend less without buying a worse driveway

  1. 1. Reduce the area, not the specification

    Most front drives are bigger than the parking they actually need. Taking 12m² out of a 50m² drive and putting a border or gravel margin there saves real money and changes nothing about what's under the parking.

  2. 2. Choose a plainer block and keep the base identical

    A standard rectangular block in a plain colour, laid in a simple herringbone with a single soldier course, costs less per square metre than a textured or tumbled range with a contrasting border. The excavation, membrane, sub-base and haunching stay exactly the same.

  3. 3. Ask about autumn and winter dates

    The book is quieter from late autumn onwards. Block paving and gravel are largely weather-indifferent; tarmac and resin have working windows we'd tell you about. Taking a date nobody else wants is the simplest discount in the trade.

Common questions

What is the cheapest driveway option in the UK?

Gravel, at roughly £45–£85 per square metre installed over a properly compacted sub-base. Tarmac is next at £75–£110. Both are real driveways when they're built correctly; the price difference is the material on top, not the structure underneath.

Is cheap block paving worth it?

Cheap blocks are fine. A cheap build-up under them is not. If a block paving quote is well below £95 per square metre, the saving has almost certainly come out of the excavation depth, the membrane, the sub-base or the edge haunching — the parts you can't inspect once it's finished.

Are The Vale Company cheap?

No. We build to one specification and we price it fixed, which puts us in the middle of the market rather than the bottom of it. If budget is the deciding factor, gravel or tarmac from us — or from anyone building them properly — is a better answer than a discounted block paved drive.

How can I get a driveway on a small budget?

Reduce the area rather than the specification, choose a plainer material and keep the base identical, and ask about autumn or winter dates when the diary is quieter. All three save money without changing what's under the surface.

Start with the two cheaper surfaces

If budget is what's driving the decision, these are the two pages worth your time. Not the expensive ones.