Put your own numbers in below and you'll get a range in about a minute — no name, no email. A two-car block paved drive of about 50m² in Aylesbury runs £6,000–£8,750 depending on the block, what's there now, and whether the drainage needs work.

Clay and permeable blocks sit at the top of the band.

How big is the area

We've assumed about 40m². Pick "I know my measurements" if that isn't right — a single car space is roughly 15–20m².

Indicative range

Estimate — not a quote, not binding

£4,800£7,000

This is an estimate, not a quote. It's built from the same rates we work to, but the site itself decides the real number: how deep we have to dig before we find something that will take a sub-base, what the ground does after rain, where the water has to go, whether a lorry can get near the house, and what has to come out first. On Gault Clay the dig is often deeper than people expect. We only give a fixed price after we've stood on the ground.

Get a fixed price for this

Nothing shown here is an offer or a binding price. Your inputs stay in this browser so the range is still here if you come back or refresh.

The bands behind the calculator

These bands, and the range the calculator gives you, are indicative only — an estimate, not a quote, and not a binding offer. The fixed price comes after we've stood on your ground.

How the range is worked out

No black box. The calculator does exactly this, in this order — and the same arithmetic appears on the PDF breakdown you can download after a run.

  1. Step one — the rate band

    Each surface has a low and a high £/m². The low end assumes a simple shape, few cuts and a mid-range product. The high end assumes curves and radii, more cutting, and a clay or permeable block. Both ends include the full build-up we quote to — dig, membrane, compacted sub-base, laying course, edgings haunched in concrete.

  2. Step two — your area

    The band is multiplied by the square metres. Presets are typical sizes, not measurements — a single car space is roughly 15–20m². Above 400m² the rate per square metre usually comes down, so the calculator says so rather than pretending otherwise.

  3. Step three — ground and access

    Two multipliers, applied to the subtotal. What's there now: grass, soil or borders ×1, old gravel or hardcore ×1.03, old slabs or block paving ×1.12, concrete or tarmac ×1.3. Access: ×1, ×1.07, ×1.2 from a straight run off the road, through a tight entrance, to a barrow run with no lorry access. Breaking out concrete or tarmac is the single biggest swing on a driveway price.

  4. Step four — fixed additions

    Drainage is added as a flat figure rather than a rate, because that's how it costs: linear channel drain across the threshold £600, new soakaway (no permeable surface) £850. A permeable surface often removes the need for either.

  5. Step five — the minimum

    Our minimum job value is £1,500. It is never applied silently — if your range falls under it the calculator tells you, because mobilising a team, a digger and a skip costs much the same at 10m² as it does at 40m².

What changes the total most